HVAC Takeoff Software for Insulation Contractors
Free preview takeoff
One sheet · About half the rows · CSV export · No credit card · Runs in your browser on Mac or Windows
Try a Free Preview TakeoffSee an AI Takeoff in 10 Seconds
The sample is a real DuctIQ takeoff workbook: no signup. Plans and credits are on the pricing page.
An insulation sub bids from the same mechanical drawings as the sheet metal shop, but prices by the square foot. Before you can price wrap or liner you still need what the sheet metal estimator needs: every duct run measured by system and size, and a clear read of which runs the spec says to wrap, line or leave bare.
DuctIQ does the measuring. Upload the mechanical PDF and it returns duct linear feet by system and size, with round and rectangular kept apart, and it carries liner callouts from the spec and notes onto the runs they apply to. It does not calculate square footage for you: the export gives size and length on every line, so the area is one formula column in Excel.
Why duct insulation takeoffs eat a bid day
Insulation area depends on the perimeter of each duct size, so a single total length for a system is not enough. 100 feet of 24x12 carries twice the surface of 100 feet of 12x6. You need linear feet by size, by system, for every run the spec covers.
Getting there by hand means tracing the same ductwork the sheet metal shop traces, then reading the insulation section of the spec and the general notes for the exceptions: exposed duct that is not wrapped, lined runs that skip external wrap, outdoor duct with a heavier jacket. That is hours of measuring before you price a single square foot.
What DuctIQ gives an insulation estimator
DuctIQ reads the mechanical plan sheets and returns a structured takeoff you can open in Excel:
- Duct linear feet by system (supply, return, exhaust) and by size, with round and rectangular kept apart.
- Liner callouts from the spec and notes on the runs they apply to: a thickness when one is given, acoustic liner, lined, or none when the spec says unlined.
- A source sheet on every line, and a Confidence level that flags the reads worth a second look.
- Detail sheets and schedules used to resolve tags, never measured again, so runs are not counted twice.
Download a sample takeoff (Excel)See the export columns
Start your free preview takeoffOr download a real sample takeoff first
From the export to square feet
Area is perimeter times length. Add one column to the Ductwork sheet: for rectangular duct, 2 x (width + height) / 12 x linear feet; for round duct, 3.1416 x diameter / 12 x linear feet. Sum by system and by wrap or liner type, then add your usual overlap and waste allowance.
The step-by-step method, with worked numbers for wrap thickness and lined runs that are built larger than the size shown, is on the duct insulation and liner takeoff guide.
| Duct line from the export | Perimeter | Surface area |
|---|---|---|
| Supply, 24x12, 100 LF | 6.0 ft | 600 sq ft |
| Return, 20x10, 86 LF | 5.0 ft | 430 sq ft |
| Supply, 12 in round, 50 LF | 3.14 ft | 157 sq ft |
Worked examples using the perimeter rule. Your allowances for fittings, overlap and waste are applied on top.
Duct insulation and liner takeoff, step by step
What DuctIQ does not do for an insulation sub
DuctIQ is an HVAC ductwork takeoff. It does not calculate insulation square footage, price material or labour, or decide which runs to insulate when the spec is silent. Liner and wrap rules come from your reading of the specification; DuctIQ carries the callouts it finds onto the measured runs so you can check them.
It reads 2D mechanical PDFs, so a drawing without a readable scale or with duct sizes missing comes back with those lines flagged rather than guessed.
Try it on a job you are bidding now
Pick a mechanical set you are pricing this week. Upload the PDF, review the flagged lines, add the area column, and compare it with your own count. Your first takeoff is a free preview (one sheet, about half the rows, CSV) and needs no card, and the sample file shows the exact Excel layout before you upload anything.
Run a free preview takeoff on your own drawingSee DuctIQ pricing
Start with a free preview takeoff
Upload a mechanical PDF and DuctIQ takes off one sheet as a free preview: about half the measured rows, with a CSV export, so you can judge the accuracy on your own drawing. No credit card. Paid plans return the complete takeoff with Excel.
Built by a practicing P.Eng and principal of an Ontario mechanical contracting firm, for the estimators at that firm.
Start your free preview takeoff Download a sample takeoff See pricingNew to AI takeoff and want a hand? Send us your first drawing and we'll help you review the output, or book a 1:1 walkthrough.
Related HVAC takeoff guides
Frequently asked questions
Does DuctIQ calculate duct insulation square footage?
No. It measures duct linear feet by system and size and exports them, so the area is one formula column in Excel using the duct's perimeter. The duct insulation and liner takeoff guide shows the formula with worked numbers.
Does it know which runs are lined or wrapped?
It reads liner callouts from the spec and notes and carries them onto the runs they apply to. The wrap and liner rules for each system still come from your reading of the insulation section of the specification.
Will it double count runs shown on details?
No. Detail sheets, schedules and legends are used to resolve tags and attributes, not measured again, so the footage reflects the plan views only.
What drawings do I need?
The mechanical PDF set you are bidding, with readable plan scales and duct size labels. Lines it cannot read with confidence are flagged with the reason instead of being filled in.
How much does it cost to try?
Your first takeoff is a free preview (one sheet, about half the rows, CSV) with no card required. Paid plans are listed on the pricing page.